|
Product Detail :
|
SUPPLY OF LABOR TRANSPORTATION MATERIALS EQUIPMENT TOOLS AND EVERYTHING NECESSARY FOR THE COMPLETE EXECUTION OF THE WORK DESCRIBED FOR THE ELECTRICAL AREA OF THE LOAD TABLE (MDP) OF THE
|
| Tender Detail : |
Tenders are invited for SUPPLY OF LABOR TRANSPORTATION MATERIALS EQUIPMENT TOOLS AND EVERYTHING NECESSARY FOR THE COMPLETE EXECUTION OF THE WORK DESCRIBED FOR THE ELECTRICAL AREA OF THE LOAD TABLE (MDP) OF THE DETAILS (ESP. TECHNIQUES) CONTENT DEVELOPMENT 1. It is clarified that the work to be performed must be of good quality according to the regulations in force in Panama and the guidelines of NFPA 70 2020 (NEC) 2. It is clarified that the coordination of the installation of the new electrical cable must be carried out by the Contractor, for which the Social Security Fund must certify that the service fully complies with the established technical criteria. Generalities The contractor will supply, transport, unload, install and deliver to the Dionisio Arrocha Hospital all the electrical wiring to perform the maintenance service of the electrical wiring in building I (Industrial Area) in charge of feeding the central HVAC plant into the air conditioning network. Applicable Standards The structure of electrical cables must be based mainly on the REGULATION FOR ELECTRICAL INSTALLATIONS (RIE) that adopts the NFPA 70 standard (NATIONAL ELECTRICAL CODE-NEC) 2020 complemented by the resolutions issued by the JTIA and the regulations of the ASEP ENSA and NATURGY. These regulations cover everything from the design and safety of installations, conductor specifications, safety distances to protection against overcurrents. Capacity The wiring structure must contain a cross section with ampacity up to 350 A at 90 degC Nominal Voltage of 600 VAC must be THHN/THHW resistance to heat, humidity, oils and greases; Common in power installations, the wiring must indicate that it is UL certified. Activities that must be considered within the maintenance service 1. Labor and equipment to remove existing damaged wiring within electrical conduits will be delivered to the CSS for subsequent disposal. Maintenance Department Eng. William Rodriguez must guard. 2. Labor, equipment and material for the deep internal cleaning of the existing pipe ducts to be used will be carried out according to country regulations; The duct must be completely clean, free of water and dirt. 3. Supply of materials, labor and everything necessary for the installation of new power and grounding cables in caliber 350 MCM (strength) and 8 (bare) 38 linear meters for each line (3 strength and 1 bare) in 3 existing pipes. 4. The new wiring must be installed and connected to both the power IP located in the MDP of building I (Industrial Area) of the Chiller Unit and the main panel of the equipment, which must include terminal accessories and other components to subsequently start the equipment. PERMITS, EXPENSES AND REGULATIONS: The Contractor must have all the necessary permits, assume all legal and other expenses pertaining to the work under this section and comply with all national and municipal laws, codes and provisions related to the activity and public and social security (Employer Worker quota). When this Contractor is requested to |